TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 9 (Charge
Primary
Air) (Cont)
DATE
/-/
START TIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
BY
BY
CHARGE
PRIMARY AIR OP 9.4 (Cont.)
9.4.6
20 CFM HP
Approx.
100 ft.
Monitor service
line pressure
Compressor
from primary
gage
until reading
indicates
DASS Rack.
desired
pressure
(5000 PSI maximum).
NOTE
Secure
AHP-V208
on DASS
Rack with charging
hose
when not charging.
9.4.7
20 CFM HP
Approx. 100 ft.
Shut down
20 CFM HP
Compressor
from primary
Compressor
IAW
DASS
Rack.
Chapter
2, Section
3 of
TM 5-4310-389-14.
2-74
Change
6