TM 5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS (CRS)
OPERATOR CHECKLISTOP 8
DATE
/
/
START TIME
END TIME
OPERATOR 1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
POST DIVE SHUTDOWN (CRS) OP 8.1
8.1.1
88.5 CFM
Approx. 100 ft.
Secure and perform After
Compressor
from CRS
Operation
PMCS IAW
TM 5-4310-379-14.
8.1.2
AHP-V201
Secondary
DASS
Close CW.
All four racks -
Close CW.
AHP-V202
Flask Valves
8.1.3
AHP-V601
CRS-
Slowly open CCW -
AHP-V606
Control Panel
Turn back 1/4 CW.
8.1.4
ALP-V608
CRS-
Slowly open CCW -
Control Panel
Bleed all pressure
from system.
Close CW.
8.1.5
AHP-V602
CRS-
Back-off hand loaders by
AHP-V607
Control Panel
turning fully CCW, then 1/4 CW.
8.1.6
AHP-V605
CRS-
Close CW.
ALP-V614
Control Panel
Close CW.
ALP-V612
Close CW.
ALP-V613
Close CW.
ALP-V610
Close CW.
AHP-V601
Close CW.
AHP-V606
Close CW.
8.1.7
AHP-V203
Secondary
DASS
Close CW.
AHP-V204
All four racks
Close CW.
AHP-V205
Close CW.
8.1.8
SDASS
Remove all LP, HP, and
Interconnecting
hoses from
system.
Replace protective caps as
each hose is disconnected.
8.1.9
SDASS
Perform After Operation
PMCS
IAWTable 2-1.
Conducted
By:
Rank:
Date/Time
Verified By:
Rank:.
Date/Time
Supervisor:
Rank:
Date/Time
Change 6
2-71