TM 5-4220-231-14&P
2-70 Change 6
OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS
OPERATOR CHECKLIST OP 7 - (Cont)
DATE /_ /_
START TIME
END TIME .
OPERATOR 1
OPERATOR 2
LOCATION .
STEP
ITEM
LOCATION
ACTION
PERFORMED
BY
CHECKED
BY
POST-DIVE SHUT DOWN OP 7.1 (Cont.)
7.1.15
AHP-V403
DACC - HP, LP,
Close CW.
ALP-V404
and Console
Close CW.
ALP-V414
Pressure Gage
Close CW.
AHP-V407
Isolation Valves
Close CW.
ALP-V408
Close CW.
7.1.16
ALP-V411
DACC-
Close CW.
ALP-V412
Control Panel
Close CW.
7.1.17
ALP-V504
VTA -
Drain valve
Slowly open CCW.
Allow moisture to drain.
Close CW.
7.1.18
ALP-V509
VTA -
Control Panel
Close CW.
7.1.19
AHP-V201
Secondary DASS
all four racks -
Close CW.
AHP-V202
Flask Valves
Close CW.
7.1.20
AHP-V203
Secondary
Bottom Right
DASS Rack
Open valve CCW until
AHP-G211 reads 0 PSIG.
Bleeds all hoses.
7.1.21
AHP-V204
Secondary DASS
All four racks.
Close CW.
7.1.22
AHP-V203
Secondary DASS
All four racks.
Close CW.
7.1.23
AHP-V205
Secondary DASS
All four racks.
Close CW.
7.1.24
SDASS
Bleed all umbilicals down
from diving helmets.
Remove all umbilicals, (Air and
Pneumo hoses), HP, LP, and
Interconnecting hoses from
system.
Replace protective caps as
each hose is disconnected.
7.1.25
SDASS
Perform After Operation PMCS
IAW Table 2-1.
Conducted By:
Rank:
Date/Time .
Verified By:
Rank:
Date/Time .
Supervisor:
Rank:
Date/Time .