TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 10 (Charge
Secondary
Air) (Cont)
DATE
START TIME
END TIME
OPERATOR 1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
BY
BY
SECURE
CHARGING
OPERATIONS
OP 10.5
WARNING
OP 10.5 should
not be done during diving or chamber
operations.
When diving
operations
are conducted
using Configuration
2 the compressor
charging
hose
should
not be connected
to the DASS Rack that has the 50 ft. hose supplying
secondary
air on it. Failure to follow this instruction
could produce
a hazardous
condition
by securing
secondary
air to the DACC.
10.5.1
AHP-V206
Secondary
DASS
Close CW.
Rack (with
AHP-V207
charging
hose)
-
Flask Valves
10.5.2
AHP-V208
Secondary
DASS
Slowly open CCW -
Rack (with
Turn back 1/4 CW.
charging
hose)
10.5.3
AHP-V21 0
Secondary
DASS
Slowly open CCW bleeding
all
Rack (with
pressure
from system.
charging
hose)
Close
CW.
10.5.4
AHP-V208
Secondary
DASS
Close
CW.
Rack (with
charging
hose)
10.5.5
AHP-V208
Secondary
DASS
Remove
Charging
Hose.
Rack (with
Replace
protective
caps as
charging
hose)
each
hose
is disconnected.
10.5.6
20 CFM HP
Approx.
100 ft.
Perform After Operation
PMCS
Compressor
from Secondary
IAW TM 5-4310-389-14.
DASS Rack.
Conducted
By:
Rank:
Date/Time
Verified By:
Rank:
Date/Time
Supervisor:
Rank:
Date/Time
Change
6
2-79