TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 10 (Charge Secondary Air)
DATE
/-/-
STARTTIME
END TIME
OPERATOR
1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
HOSE CONNECTIONS
OP 10.1
NOTE
If SDASS is already set up for diving operations,
omit OP 10. 1 through OP 10.3.
If diving in Configuration
1, omit OP 10. 1 through OP 10.3.
WARNING
DO NOT CHARGE DIVER'S AIR WHILE DIVING OPERATIONS
ARE IN PROGRESS!
10.1.1
SDASS
Perform Before Operation
PMCS
IAW Table 2-1.
10.1.2
AHP-V203
Secondary
Connect
8 ft. interconnecting
Bottom
Left
hose to top left DASS
Rack
DASS
Rack
AHP-V204.
Secure
safety
wires.
10.1.3
AHP-V203
Secondary
Connect
8 ft. interconnecting
Top Left
hose to top right DASS
Rack
DASS
Rack
AHP-V204.
Secure
safety
wires.
10.1.4
AHP-V203
Secondary
Connect
8 ft. interconnecting
Top Right
hose to bottom
fight DASS
DASS
Rack
Rack AHP-V204.
Secure
safety
wires.
ENABLE
THE SECONDARY
DASS
OP 10.2
10.2.1
AHP-V205
Bottom
Left
Fully open CCW -
DASS
Rack
Turn back
1/4 CW.
10.2.2
AW-709-
Bottom Left
Slowly open
fully CCW -
AHP-V202
DASS Rack -
Turn back
1/4 CW.
Flask Valves
10.2.3
AHP-V205
Top Left
Fully open
CCW -
DASS
Rack
Turn back
1/4 CW.
10.2.4
AHP-V201
Top Left
Slowly open fully CCW -
AHP-V2W-
DASS Rack -
Turn back 1/4 CW.
Flask Valves
10.2.5
AHP-V205
Top Right
Fully open CCW-
DASS
Rack
Turn back 1/4 CW.
10.2.6
AHP-V201
Top Right
Slowly open
fully CCW-
AHP-V202
DASS Rack -
Turn back 1/4 CW.
Flask Valves
10.2.7
AHP-V205
Bottom
Right
Fully open CCW-
DASS
Rack
Turn back
1/4 CW.
10.2.8
AHP-V201
Bottom
Right
Slowly open
fully CCW
-
AHP-VT0-2
DASS
Rack
-
Turn back
1/4 CW.
Flask
Valves
2-76
Change
6