Home
Download PDF
Order CD-ROM
Order in Print
OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS 10 -cont - TM-5-4220-231-14P_113
OPERATION PROCEDURES (OP) FOR DIVING OPERATIONS 10 -cont - TM-5-4220-231-14P_115
TM-5-4220-231-14P Recompression Chamber 3-Person Model RC-100-2 Serial Numbers 08-A-163 Thru 08-A-172 Manual
Page Navigation
85
86
87
88
89
90
91
92
93
94
95
TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 10 (Charge
Secondary
Air) (Cont)
DATE
/-/-
STARTTIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
BY
BY
CHARGE
SECONDARY
AIR OP 10.4 (Cont.)
10.4.6
20 CFM HP
Approx.
100 ft.
Monitor service
line pressure
Compressor
from secondary
gage
until reading
indicates
DASS
Rack.
desired
pressure
(5000
PSI maximum).
NOTE
Secure
AHP-V208
on DASS
Rack with charging
hose when
not charging.
10.4.7
20 CFM HP
Approx.
100 ft.
Shut down 20 CFM HP
Compressor
from secondary
Compressor
IAW
DASS
Rack.
Chapter
2, Section
3 of
TM 5-4310-389-14.
2-78
Change
6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business