TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 10 (Charge
Secondary
Air) (Cont)
DATE
/-/-
STARTTIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
BY
BY
CHARGE
SECONDARY
AIR OP 10.4 (Cont.)
10.4.6
20 CFM HP
Approx.
100 ft.
Monitor service
line pressure
Compressor
from secondary
gage
until reading
indicates
DASS
Rack.
desired
pressure
(5000
PSI maximum).
NOTE
Secure
AHP-V208
on DASS
Rack with charging
hose when
not charging.
10.4.7
20 CFM HP
Approx.
100 ft.
Shut down 20 CFM HP
Compressor
from secondary
Compressor
IAW
DASS
Rack.
Chapter
2, Section
3 of
TM 5-4310-389-14.
2-78
Change
6