TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 9 (Charge Primary Air)
DATE-/-/-
STARTTIME
END TIME
OPERATOR 1
OPERATOR 2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
HOSE
CONNECTIONS
OP 9.1
NOTE
If SDASS
is already
set up for diving operations,
omit OP 9.1 through
OP 9.3.
If diving in Configuration
1, omit OP 9.1 through
OP 9.3.
WARNING
DO NOT CHARGE
DIVER'S
AIR WHILE DIVING OPERATIONS
ARE IN PROGRESS!
9.1.1
SDASS
Perform
Before
Operation
PMCS
IAW Table 2-1.
9.1.2
AHP-V203
Primary
Connect
8 ft. interconnecting
Bottom
Left
hose to top left DASS Rack
DASS Rack
AHP-V204.
I
Secure
safety
wires.
9.1.3
AHP-V203
Primary
Connect
8 ft. interconnecting
Top Left
hose
to top right DASS Rack
DASS Rack
AHP-V204.
Secure
safety
wires.
9.1.4
AHP-V203
Primary
Connect
8 ft. interconnecting
Top Right
hose to bottom
right DASS
DASS Rack
Rack AHP-V204.
Secure
safety
wires.
ENABLE YHE PRIMARY
DASS OP 9.2
9.2.1
AHP-V205
Bottom
Left
Fully open CCW -
DASS
Rack
Turn back
1/4 CW.
9.2.2
AHP-V201
Bottom
Left
Slowly open
fully CCW -
DASS
Rack -
Turn back
1/4 CW.
AHP-V202
Flask Valves
9.2.3
AHP-V205
Top Left
Fully open
CCW
-
DASS
Rack
Turn back
1/4 CW.
9.2.4
AHP-V201
Top Left
Slowly
open
fully CCW -
AHP-V202
DASS
Rack -
Turn back 1/4 CW.
Flask
Valves
9.2.5
AHP-V205
Top Right
Fully open
CCW -
DASS
Rack
Turn back 1/4 CW.
9.2.6
AHP-V201
Top Right
Slowly open
fully CCW -
AHP-V202
DASS
Rack -
Turn back
1/4 CW.
Flask
Valves
9.2.7
AHP-V205
Bottom
Right
Fully open
CCW -
DASS
Rack
Turn back
1/4 CW.
9.2.8
AHP-V201
Bottom
Right
Slowly
open
fully CCW -
AHP-V202
DASS
Rack -
Turn back
1/4 CW.
I
Flask
Valves
2-72