TM 5-4220-231-14&P
Section
Ill. SERVICE
UPON RECEIPT
3-4
Scope.
This section
covers
information
required
by unit maintenance
personnel
to ensure
the equipment
will
be adequately
inspected
before
it is subjected
to normal
use.
These
procedures
include
site
and
shelter
requirements,
service
upon receipt
of material,
and preliminary
servicing
adjustment.
3-5
Site and
Shelter
Requirements.
The site must provide
adequate
area to allow placement
of SDASS
components
which, when
assembled,
can function
for diving or recompression
operations.
The site area should
be free of oil, dirt, hazardous
solvents,
and other foreign substances.
Sheltering
the SDASS
requires
a covered
or enclosed
area,
to protect
components
from weather
and unauthorized
personnel
during
extended
periods
of
unuse.
Coverage
by tarpaulins
or heavy
plastic
sheets,
etc., may afford temporary
sheltering
for short storage
periods.
3-6
Unpacking
Instructions.
No specific
unpacking
instructions
must be followed.
3-7
Checking
Unpacked
Equipment.
a.
Inspect
each
component
for damage
incurred
during
shipment,
IAW Before
checks,
Preventive
Maintenance
Checks
and Services
located
in Chapter
2.
b.
Check
the equipment
against
the packing
slip to see
if the shipment
is complete.
Report
all
discrepancies.
WARNING
DO NOT OPERATE
IF UNAUTHORIZED
MODIFICATIONS
HAVE BEEN MADE TO ANY
COMPONENT
PART OF THE SYSTEM.
c. Check
to see if equipment
has been
modified.
3-8
Preliminary
Service
and
Adjustments.
No preliminary
service
or adjustments
are required.
Section
IV. PREVENTIVE
MAINTENANCE
CHECKS
AND SERVICES
(PMCS)
3-9
SDASS
Maintenance
Schedule.
The
maintenance
requirements
of the
SDASS
are
all related
to time
intervals.
Table
3-1,
Operator/Unit
Level
PMCS
Schedule,
lists the
maintenance
item,
maintenance
interval,
and
procedures
for each
SDASS
component.
3-2