TM 5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 6 (Cont)
DATE-/-/
STARTTIME
END TIME
OPERATOR1
OPERATOR 2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
ENABLE THE SECONDARY
DASS OP 6.2
(Cont.)
6.2.4
AHP-V201
Top Left
Slowly open fully CCW -
DASS Rack -
Turn back 1/4 CW.
AHP-V202
Flask Valves
6.2.5
AHP-V205
Top Right
Fully open CCW -
DASS Rack
Turn back
1/4 CW.
6.2.6
AHP-V201
Top Right
Slowly open
fully CCW -
DASS Rack -
Turn back
1/4 CW.
AHP-V202
Flask Valves
6.2.7
AHP-V205
Bottom Right
Fully open CCW -
DASS Rack
Turn back 1/4 CW.
6.2.8
AHP-V201
Bottom Rig;t
Slowly open fully CCW -
DASS Rack -
Turn back 1/4 CW.
AHP-V202
Flask Valves
I
I
CASCADE
THE SECONDARY
DASS OP 6.3
6.3.1
AHP-V203
Bottom Left
Slowly open
CCW -
DASS Rack
Turn back 1/4 CW.
6.3.2
AHP-V204
Top Left
Slowly open CCW -
DASS Rack
Turn back 1/4 CW.
6.3.3
AHP-V203
Top Left
Slowly open CCW -
DASS Rack
Turn back 1/4 CW.
6.3.4
AHP-V204
Top Right
Slowly open CCW -
DASS Rack
Turn back 1/4 CW.
6.3.5
AHP-V203
Top Right
Slowly open CCW -
DASS Rack
Turn back 1/4 CW.
6.3.6
AHP-V204
Bottom Right
Slowly open CCW -
DASS Rack
Turn back 1/4 CW.
6.3.7
AHP-V203
Bottom Right
Slowly open CCW -
DASS Rack
Turn back 1/4 CW -
Releases
pressure
to
CRS HP IN.
6.3.8
AHP-G211
All Four Racks
Record pressure: -PSIG.
Reading
on AHP-G211
should
be the same
on all four
secondary
DASS racks.
ENABLE THE CRS OP 6.4
6.4.1
AHP-V605
CRS -
Fully open CCW -
Control
Panel
Turn back 1/4 CW.
6.4.2
ALP-V614
CRS-
Fully open CCW -
Control
Panel
Turn back 1/4 CW.
Change
6
2-67