TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 4 - (Cont)
DATE-/-/-
STARTTIME
END TIME
OPERATOR 1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PER-
CHECKED
IFORMED BY
BY
SYSTEM
SET-UP
OP 4.1 (Config.
2)
(Cont.)
4.1.7
DACC
Prepare
the DACC to be
mounted
on the VTA by
removing
cover, opening
rear
panel,
and inserting
support
arms
as shown
in Figures
2-13
and 2-14.
4.1.8
DACC
VTA
Using two-man
lift, grasp
handles
and lift DACC into
place
on VTA as shown
in
Figure
2-15.
Secure
DACC to
VTA by inserting
retaining
pins
through
DACC support
arms.
4.1.9
VTA
Remove
rear retaining
pins
from the top of the VTA control
panel
and rotate
panel
to its
upright
position.
Secure
the
panel
in the upright
position
by
inserting
retaining
pins through
rear panel
supports.
4.1.10
CRS
Approx.
25 ft.
Position
CRS.
from Secondary
DASS
Rack.
4.1.
1
AHP-V406
DACC - Control
Back-off
hand
loaders
by
AHP-V402
Panel,
Primary
turning
fully CCW, then 1/4 CW.
and Secondary
4.1.12
AHP-V405
DAM
Close
CW.
AHP-V401
M=
Close
CW.
-ALP-V412
ZW=
Close
CW.
ALP-V411
DACC
Close
CW.
ALP-V410
Close
GW.
AHP-V407
Close
CW.
ALP-V408
DACC
Close
CW.
AHP-V409
DACC
Close
CW.
ALP-V414
C
Close
GW.
ALP-V404
ZW=
Close
CW.
AHP-V403
DACC
Close
CW.
ALP-V416
DAGG
Close
CW.
ALP74-17
DACC
-cro-s-eM.
ALP-V418
DACC
-rTlo-se
CW.
2-56
Change
6