TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 3
DATE-/-/-
STARTTIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
POST-DIVE
SHUT DOWN OP 3.1
(Cont.)
3.1.16
AHP-V403
DACC - HP, LP,
Close
CW.
ALP-V404
and Console
Close
CW.
ALP-V414
Pressure
Gage
Close
CW.
Isolation
Valves
AHP-V407
Close
CW.
ALP-V408
Close
CW.
3.1.17
ALP-V411
DACC-
Close
CW.
ALP-V412
Control
Panel
Close
CW.
3.1.18
ALP-V504
VTA -
Slowly open CCW.
Drain valve
Allow moisture
to drain.
Close
CW.
3.1.19
ALP-V509
VTA -
Close
CW.
Control
Panel
3.1.20
SDASS
Bleed
all umbilicals
down
from
diving helmets.
Remove
all umbilicals.
(Air and
Pneumo
hoses),
HP, LP, and
Interconnecting
hoses
from
system.
Replace
protective
caps
as
each
hose
is disconnected.
3.1.21
SDASS
Perform
After Operation
PMCS
IAW Table 2-1.
Conducted
By:
Rank:
Date/Time
Verified
By:
Rank:,
Date/Time
Supervisor:
Rank:.
Date/Time
2-52
Change
6