TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 5
DATE -/-/
START TIME
END TIME
OPERATOR 1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
BY
BY
NOTE
8ft. Interconnecting hoses shall be positioned between Top and Bottom DASS Racks during set-up.
NOTE
Secure
and bleed pressure
from hoses
prior to correcting
leaks.
HOSE CONNECTIONS OP 5.1 (Config. 2)
5.1.1
SDASS
Perform Before Operation
PMCS IAW Table 2-1
5.1.2
AHP-V203
Primary Bottom
Connect 8 ft. interconnecting
Left DASS Rack
hose to top left DASS Rack
AHP-V204.
Secure safety
wires.
5.1.3
AHP-V203
Primary Top Left
Connect 8 ft. interconnecting
DASS Rack
hose to top right DASS Rack
AHP-V204.
Secure safety
wires.
5.1.4
AHP-V203
Primary Top Right
Connect 8 ft. interconnecting
DASS Rack
hose to bottom fight DASS
Rack AHP-V204.
Secure
safety wires.
5.1.5
AHP-V203
Primary Bottom
Connect 25/100 ft. HP hose at
Right DASS Rack
AHP-V203 to DACC primary
HP IN fitting.
Secure
safety wires.
5.1.6
AHP-V203
Secondary
Connect 8 ft. interconnecting
Bottom Left
hose to top left DASS Rack
DASS Rack
AHP-V204.
Secure safety
wires.
5.1.7
AHP-V203
Secondary
Top
Connect 8 ft. interconnecting
Left DASS Rack
hose to top right DASS Rack
AHP-V204.
Secure safety
wires.
5.1.8
AHP-V203
Secondary
Top
Connect 8 ft. interconnecting
Right DASS Rack
hose to bottom fight DASS
Rack AHP-V204.
Secure
safety wires.
NOTE
Directions (Left/Right) are correct when facing DASS front panel.
5.1.9
AHP-V209
Secondary
Connect 25/100 ft. HP hose at
Bottom Left
AHP-V209 to DACC secondary
DASS Rack
HP IN fitting. Secure safety
Rear Panel
wires.
2-60
Change
6
