TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 3
DATE
/
/ START TIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
IBY
BY
POST-DIVE
SHUT DOWN OP 3.1
3.1.1
ALP-V505
VTA Control
Close
CW.
Panel
3.1.2
ALP-V506
VTA Control
Close CW.
Panel
3.1.3
ALP-V507
VTA Control
Close CW.
Panel
3.1.4
AHP-V201
Primary DASS
Close
CW.
AHP-V202
Primary DASS
Close CW.
3.1.5
AHP-V201
Secondary
DASS
Close CW.
AHP-V202
Secondary
DASS
Close CW.
AHP-V206
Secondary
DASS
Close CW.
AHP-V207
Secondary
DASS
Close CW.
3.1.6
AHP-V401
DACC-
Open CCW. Arrow points open.
Secondary
HP IN
3.1.7
ALP-V413
DACC-
Slowly open CCW to bleed air
Rear Panel
from DACC, then close.
NOTE
If SDASS
will be left assembled,
and diving operations
will commence
within
24 hours,
omit steps
3.1.8,
and 3.1.21.
3.1.8
ALP-V508
VTA -
Remove
protective
cap.
Bleed
valve
Slowly open
CCW.
Bleed
all pressure
from system.
Close
CW.
Replace
cap.
3.1.9
AHP-V203
Primary
DASS
Close
CW.
3.1.10
AHP-V209
Secondary
DASS
Crose
CW.
3.1.11
AHP-V205
Primary
DASS
Close
CW.
3.1.12
AHP-V203
Secondary
DASS
Remove
protective
cap.
Slowly open
CCW.
Bleed
all pressure
from system.
Close
CW.
Replace
cap.
3.1.13
AHP-V205
gecondary
DASS
Close
CW.
3.1.14
AHP-V405
DACC - Control
Close
CW.
AHP-V401
Panel,
Primary
and Secondary
3.1.15
AHP-V402
DACC - Control
Back off hand
loaders
by
AHP-V406
Panel,
Primary
turning
fully CCW,
then
1/4 CW.
and Secondary
Change
6
2-51