TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 4
DATE
1-1-
STARTTIME
END TIME
OPERATOR 1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
_rP_ER-
JCHEC
En
I FORMED
BY
BY
SYSTEM SET-UP
OP 4.1 (Config. 2)
4.1.1
SDASS
Perform
Before Operation
PMCS IAW Table 2-1
NOTE
Tag lines must be used when stacking
DASS Racks.
NOTE
Primary and Secondary
DASS Racks
must be charged
from separate
sources.
NOTE
Deck and Interconnecting
Hose length must be considered
during setup.
NOTE
SDASS
Configuration
2 is shown
in Figure 2-11.
4.1.2
Bottom
Position
Bottom
Primary
DASS,
Primary
Racks
18 in. to 24 in. apart with
DASS
racks facing the same
direction.
Racks
4.1.3
Top Primary
Lift and then lower Top Primary
DASS
DASS Racks
onto the Bottom
Racks
Primary DASS Racks
as shown
in Figure 2-12.
Top Racks
must face the same
direction
as the bottom racks.
4.1.4
Bottom
Position
Bottom Secondary
Secondary
DASS Racks
18 in. to 24 in.
DASS
apart with racks facing the
Racks
same
direction.
4.1.5
Top
Lift and then lower Top
Secondary
Secondary
DASS Racks
onto
DASS
the Bottom Secondary
DASS
Racks
Racks
as shown
in Figure
2-12.
Top Racks
must face the same
direction
as the bottom
racks.
NOTE
Secure
DASS Racks IAW established
Standard
Operating
Procedures
(SOP).
4.1.6
VTA
Approx. 25 ft.from
Position VTA.
Primary
DASS
Rack
Change
4
2-53