TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 4 - (Cont)
DATE
/-/
START TIME
END TIME
OPERATOR
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PER-
CHECKED
IFORMED BY
BY
SYSTEM SET-UP
OP 4.1 (Config. 2) (Cont.)
4.1.13
ALP-V413
DACC - Rear
Close CW.
4.1.17- ALP-V504
VTA
Close Cw.
ALP-V505
Close CW.
ALP-V506
Close CW.
ALP-V507
VTA
Close CW.
-
ALP-V508
VTA
Close CW.
ALP-V509
VTA-
Close CW.
4.1.15
AHP-V201
DASS Racks
-
Close
CW.
AHP-V202
Front - All Flask
Close
CW.
Valves
4.1.1.
6
AHP-V203
Racks
-
Close
CW.
AHP-V204
Front - All
Close
CW.
AHP-V205
Close
Cw.
4.1.
17
-ARP-V206
DASS Racks -
Close CW.
AHP-V207
Rear - All Flask
Close
CW.
Valves
NOTE
If diving in Configuration
2, no chamber
required;
Omit steps
4.1.19
through
4.1.22.
4.1.18
AHP-V208
DASS Racks -
Close
CW.
AHP-V2-09
Rear - All
Close
CW.
AHP-V210
Close
CW.
4.1.19
AHP-V602
CRS
Back off handloaders
by turning
AHP-V607
fully CCW, then 1/4 CW.
4.1.20-
AHP-V601
CRS
Close CW.
AHP-V606
CRS
Close CW.
ALP-V612
CRS
Close GW.
AIX-VU1-3
CRS
Close CW
ALP-V610
Close
CW.
ALP-V608
CRS
Close
CW.
AHP-V605
CRS
Close
CW.
LP-V614
CRS
Close
CW.
Conducted
By:
Rank:
Date/Time
Verified
By:
Rank:
Date/Time
Supervisor:
Rank:
Date/Time
*1
2
-1
4
F12
02
Change
6