TM5-4220-231-14&P
OPERATION PROCEDURES (OP) FOR DIVINGOPERATIONS
OPERATOR CHECKLISTOP 2 - (Cont.)
DATE
START TIME
END TIME
OPERATOR1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PERFORMED
CHECKED
Y
-[BY
BY
ENABLE SECONDARY
DASS OP 2.3
2.3.1
AHP-V205
DASS Rack
Fully open CCW -
Turn back 1/4 CW.
2.3.2
AHP-V201
DASS Rack -
Slowly open fully CCW -
Front -
Turn Back 1/4 CW.
AHP-V202
Flask Valves
AHP-V206
Rear -
Slowly open fully CCW -
AHP-V207
Flask Valves
Turn Back 1/4 CW.
2.3.3
AHP-V209
DASS Rack
Slowly open CCW -
Turn back 1/4 CW -
Release
pressure
to DACC
Primary
HP IN.
2.3.4
AHP-G211
DASS Rack
Record
Pressure:
PSIG.
ENABLE THE SDASS
OP 2.4
2.4.1
ALP-V509
VTA Control
Open CCW -
Panel
Arrow points open.
2.4.2
AHP-V403
DACC Control
Open CCW -
Panel -
Arrow points open.
Secondary
2.4.3
ALP-V404
DACC Control
Open CCW -
Panel -
Arrow points open.
Secondary
2.4.4
ALP-V414
DACC Control
Open CCW -
Panel - Center
Arrow points open.
2.4.5
AHP-V401
DACC Control
Slowly open CCW -
Panel -
Arrow points open.
Secondary
2.4.6
AHP-G421
DACC Control
Read and record
pressure:
Panel -
should be the same
as
Secondary
secondary
DASS
AHP-G211.
Pressure
PSIG.
NOTE
Supervisor:
Calculate
air requirements
for planned
diving operations.
o
a
s
If sec
ndary
DASS
r ck pressure
is not
ufficient,
complete
OP 10 at this time.
2.4.7
AHP-V402
DACC
Control
Adjust to desired
over bottom
Panel
-
pressure.
Record
pressure
Secondary
from ALP-G422.
Pressure
PSIG.
Change
6
2-49