TM 5-4220-231-14&P
Table 3-1 Unit Level PMCS Schedule
(Con't).
H-Hourly
M-Monthly
Q-Quarterly
A-Annually
ITEM
INTERVAL
ITEM TO BE
PROCEDURE
Equipment
is Not
NO
__F
INSPECTED
Ready/Available
if:
H
M
Q
A
18
O
Deck and Inter-
Inspect
hose assemblies
and
Any damage
is
connecting
Hose
hose fittings.
detected.
Assemblies
O
Request
intermediate
general
support
to inspect diving hose.
Conduct
coupling
pullout test.
Conduct
burst test IAW SOP.
O
Request
intermediate
general
Hydrostatic
out of
3
support to perform hydrostatic
date.
test of deck and interconnecting
hoses
lAW SOP.
3 Annually after 6 years of age.
3-7