TM 5-4220-231-14&P
Table 3-1 Unit Level PMCS Schedule
(Con't).
H-Hourly M-Monthly Q-Quarterly A-Annually
ITEM
INTERVAL
ITEM TO BE
PROCEDURE
Equipment is Not
NO
H M Q A
INSPECTED
Ready/Available
if:
13
O
Gage,
HP
Calibrate
IAW TB 9-4220-
Expired
calibra-
216-35.
tion
due date.
NOTE
Calibrate
every
540 days
or whenever
inaccuracies
are
noted.
14
O
Chamber
Inspect
frame
for broken
or
Damage
prevents
Reducing
Station
damaged
welds,
dents
or other
normal or safe
(CRS)
damage.
operation.
O
Inspect
for missing
or loose
nuts,
bolts,
and fasteners.
Check
all interconnecting
piping, fittings,
and
hoses.
O
Clean
and preserve
CRS.
15
O
Regulator,
HP
Operate
regulator
through
Regulator
jams
or
turning arc.
operates
sporadically.
16
O
Valves
Turn each
valve
through
a
Valve
is jammed,
complete
open
and close
cycle.
broken,
or does
not
perform
function.
O
Clean
and inspect
exterior
of
valve
assemblies.
Lubricate
valve
stems.
17
O
Gages
Calibrate
IAW TB 9-4220-
Expired
calibra-
216-35.
tion
due date.
NOTE
Calibrate
every
540 days
or whenever
inaccuracies
are
noted
3-6
Change
5