CHAPTER 6 Operational Planning
Change A 6-47
SHIP REPAIR SAFETY CHECKLIST FOR DIVING
(Sheet 2 of 2)
TAG OUT EQUIPMENT
TAG OUT
SIGNATURE AND RATE
Rudder
________________________________________
Anchors
________________________________________
Planes
________________________________________
Torpedo tube shutters
________________________________________
Trash disposal unit
________________________________________
Tank blows
________________________________________
Tank vents
________________________________________
Shaft(s) locked
________________________________________
Sea suctions
________________________________________
Sea discharges
________________________________________
U/W electrical equipment
________________________________________
Sonars
________________________________________
Other U/W equipment
________________________________________
USS _____________________________________
(name of ship)
CDO ____________________________________
(signature of CDO)
Figure 6-20b. Ship Repair Safety Checklist for Diving (sheet 2 of 2).
