TM 5-4220-231-14&P
(4)
Lubricate 
new   O-ring   (18),   M83248/2-
010,   with   silicone     compound 
(item   9,
19
Appendix     D),  and    place    on   tee   (19).
Position 
and     tighten     tee 
(19)    to
coupling    (16)   by  tightening     union    nut
(17)   clockwise.
0
18
17
16
(5)
Lubricate     new   O-ring   (15),   M83248/2-
010,    with   silicone     compound 
(Item   9,
Appendix     D)  and   place    on   tee    (14).
Position 
and     tighten     tee 
(14)    to
coupling     (12)   by  tightening     union    nut
(13)   clockwise.
(6)
Apply   pressure 
to   DAM 
Leak-test
with   nonionic    detergent 
solution    (NID)
12
15
GP    (Item   17,  Appendix     D).    Correct
leaks    as    necessary.
13
14
(7)
Reinstall 
and   secure     the   DACC    panel
in  the    DACC    case 
with    all  securing
screws. 
Replace 
and    secure 
case
front   cover    over   DACC    panel.
(8)
Complete 
Reentry 
Control 
Report
and    Log.
12@1
4-26