TM   5-4220-231-14&P
(7)
Apply    pressure
to   DACC.
Leak-test
with   nonionic
detergent
solution
(NID)
GP
(item
17,   Appendix
D).
Correct
leaks
as    necessary.
(8)
Reinstall
and   secure
the   DACC    panel
in   the
DACC
case
with    all   securing
screws.
Replace
and
secure
case
front   cover
over
DACC    panel.
(9)
Complete
Reentry
Control
Report
and
Log.
4-22