TM 5-4220-231-14&P
Table 2-2. Operator Preventive Maintenance Checks and Service For Chamber Operations - (Con't).
B-Before
D-During
A-After
W-Weekly
ITEM
INTERVAL
ITEM TO BE INSPECTED.
Equipment
is
NO
Not Ready/
B
D
A
W
PROCEDURE
Available
If:
15
0
0
Ensure
protective
caps
are secured
to back
panel
Protective
Con't
with retaining
cable
and set screws.
Replace
as
caps
are
required.
missing.
0
Ensure
protective
caps
are
secured
to hose
connectors.
Replace
as required.
16
0
0
Piping
(16).
Inspect
piping
on back
of DASS
panels
for bent,
dented,
or damaged
pipes.
Check
for loose
fittings.
Tighten
as required.
17
0
0
DASS Frame Assembly
(17).
Inspect
frame
for
cracked,
deteriorated,
or damaged
weld joints,
dents,
breaks,
or other
damage.
Ensure
lift rings
are
secured
to frame.
Replace
or
tighten
as required.
Inspect
five rubber
support
feet for damage.
Replace
if missing
or damaged.
Inspect
rubber
flask seating
blocks
for
Blocks
are
deterioration
or damage.
Replace
as needed.
missing.
Inspect
flask
straps
to ensure
flasks
are secure.
Tighten
as necessary.
Ensure
cotter
pins
are in
place.
Replace
as required.
2-37