TM 5-4220-231-14&P
OPERATION
PROCEDURES
(OP) FOR DIVING OPERATIONS
OPERATOR
CHECKLIST
OP 1
DATE
/
/
START TIME
END TIME
OPERATOR
1
OPERATOR
2
LOCATION
STEP
ITEM
LOCATION
ACTION
PER-
CHECKED
IFORMED BY
BY
SYSTEM SET-UP
OP 1.1 (Config. 1)
1.1.1
SDASS
Perform Before Operation
PMCS
IAW Table 2-1
NOTE
Tag lines must
be used
when
stacking
DASS
Racks.
NOT
Primary
and Secondary
DASS
Racks
must
be charged
from separate
sources.
NOTE
Deck and Interconnecting
Hose
length
must be considered
during
setup.
NOTE
SDASS
Configuration
1 is shown
in Figure 2-6..
1.1.2
Primary
Position
Primary
DASS Rack
DASS
Rack
1.1.3
Secondary
Lift and then lower secondary
DASS
Rack
DASS Rack
on top of Primary
DASS Rack
as shown
in Figure
2-7.
Secondary
DASS Rack
should
face the same
direction
as
the Primary
DASS
Rack.
NOTE
Secure
DASS
Racks
IAW established
Standard
Operating
Procedures.
1.1.4
VTA
Approx.
25 ft from
Position
VTA.
DASS
Racks
1.1.5
DACC
Prepare
the DACC to be
mounted
on the VTA by
removing
cover,
opening
rear
panel,
and inserting
support
arms
as shown
in Figures
2-8
and 2-9.
1.1.6
DACC
VTA
Using two-man
lift, grasp
handles
and lift DACC into
place
on VTA as shown
in
Figure
2-10.
Secure
DACC to
VTA by inserting
retaining
pins
through
DACC support
arms.
1.1.7
VTA
Remove
rear retaining
pins
from the top of the VTA control
panel
and rotate
panel
to its
upright
position.
Secure
the
panel
in the upright
position
by
inserting
retaining
pins through
rear panel
supports.
2-42
Change
6