TM 6-4220-231-14&P
Table 2-2.
Operator
Preventive
Maintenance
Checks
and Service
For Chamber
Operations.
B-Before
D-During
A-After
W-Weekly
ITEM
INTERVAL
ITEM TO BE INSPECTED.
Equipment
Is
NO
Not Ready/
B
D
A
W
PROCEDURE
Available
If:
STOP
Before conducting
PMCS, complete
steps
1-2 of
Assembly
Preparation
for Use Procedures
for
Chamber
Operations,
located
in Section III of this
Chapter.
1
0
SDASS for Chamber
Operations
(1). Verify all
Any missing
components
are complete
and serviced
IAW the
or unservice-
following diagram
and inspection
procedure.
able
components
are noted.
DASS
CRS
2-29