TM 5-4220-231-14&P
b. 
Replace
(1)
From    the    new    primary     high   pressure
regulator, 
remove 
the 
hex 
head
screw 
(1)   from    the    center     of   the
handle 
(4),     and 
remove 
center
spacer 
(2). 
Remove     the   three    hex
8
head     screws 
(3)   from   the    handle.
Remove     handle    (4)  and    bushing    (5).
Carefully 
remove 
neoprene 
sleeve
7
(6).
Remove 
hex    nut    (7)    from
6
regulator 
housing 
(8).
Retain 
all
5
removed 
parts.
12
(2)
Lubricate
new
O-rings
(18),
M83248/2-212, 
and    (19),    M83248/2-
010,    with   silicone     compound 
(Item   9,
Appendix     D).    Place    O-ring    (17)   on
tailpiece 
(9)   and    install    tailpiece 
in
regulator
housing
by
turning
clockwise. 
Position    O-ring   (18)  in tee
(10).
(3)
Place 
regulator 
housing 
in   opening
from   back    of   panel. 
Install   hex    nut
(7)  on  exposed 
threads 
of  housing    at
the    front   of  panel. 
Tighten    hex    nut
while 
positioning
the
regulator
correctly     for   attachment 
of  fittings   on
housing.
(4)
Lubricate
new
O-rings
(15),
M83248/2-904, 
and 
(16),
M83248/2-010, 
with 
silicone
compound 
(Item   9,  Appendix     D).
(5)
Place     O-ring    (15)   on   adapter 
(13),
and 
install 
adapter 
in     regulator
housing
by
turning 
clockwise.
15
8
Position    O-ring    (16)   on   adapter     (13).
12
Position 
and    tighten     tube     (12)    to
13
adapter     (13)  by  turning   union   nut  (14)
16
clockwise.
14
8
-@3
4
56
6
@@l 
14
4-80