TM5-4220-231-14&P(7) Screw each of the four body nuts (22) on the end of each body bolt (21). Tighten each nutsecurely.(8)Install top packing (10) over exposed end of stem (14).(9)Install new packing support (9), new gland (8), and two new stem springs (3) on end of stem (14).(10) Screw new stem nut (2) on stem (14).(11) Install grounding spring (7) over stem nut (2).(12) Install handle (6), stop plate (5), and name plate (4) over exposed end of stem (14).(13) Install a new stem spring (3) on stem (14), and secure with a new stem nut (2) on stem (14).Tighten securely.(14) Lubricate with silicone compound (Item 9, Appendix D), and install two new O-rings (23) on eachend of flanges (20).(15) Conduct operation and leak tests to ensure proper function of the valve.(16) After testing, seal assembled supply valve (1) in a clean plastic bag (Item 6, Appendix D).Package in a second plastic bag (Item 6, Appendix D) with a tag between inner and outer bagbearing the following information readable from the outside:Part No.: 13229E4598CAGE: 97403Nomenclature: Supply ValveChange 15-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business