TM   5-4220-231-14&P
(2)
Wrap    teflon    tape 
(Item    19,   Appendix 
D)
over    threads 
of   gage. 
Lubricate 
new    O-
ring 
(3), 
M83248/2-904, 
with 
silicone
compound 
(Item 
9,    Appendix 
D),    and
install    on   end    of  stem.
(3)
Install    snubber 
(4)  on   gage 
stem.
(4)
Position 
gage 
through 
hole    from    front    of
4
3
panel.
(5)
Install    and    secure 
mounting 
bracket 
(2)  to
gage     (1)  with   two   hex    nuts    (8). 
Position
wrench 
on 
each 
nut, 
and 
turn 
nut
clockwise.
8
2
8
(6)
Lubricate 
new    O-ring     (7),    M83248/2-113,
with   silicone 
compound 
(Item    9,  Appendix
D),  and    install   on   snubber 
(4).    Wrap   teflon
tape 
(Item    19,  Appendix 
D) over   threads 
of
4
snubber, 
being     careful     not   to  cover    O-ring.
(7)
Position 
and    tighten 
tube     (6)   to   snubber
(4)   by   positioning 
wrenches 
on   the    union
nut     and 
snubber.
Turn    union 
nut    (5)
clockwise.
7
6
5
(8)
Apply     pressure 
to    CRS. 
Leak-test 
with
nonionic 
detergent 
solution 
(NID)  GP   (Item
17, 
Appendix 
D).
Correct 
leaks 
as
necessary.
(9)
Complete 
Reentry 
Control 
Report     and    Log.
3-40