TM 5-4220-231-14&P
Instructions for completing the REC Report are as follows. (figure 3-2)
a.
REC Nr: A sequential
three digit number
assigned
from the control
log beginning
with 001.
b.
Julian
Date:
Julian Date
c.
2407 Control
Nr: Taken
from the DA Form 2407, upper
lefthand
corner.
d.
UIC: Unit Identification
Code
e.
System:
SDASS
f.
Subassembly:
The portion of the system
that is being worked
on.
i.e., DASS, DACC, VTA, etc.
g.
Component:
The part of the subassembly
that will be fixed, i.e., Gage
Isolation Valve, etc.
h.
S/N:
Subassembly
Serial Number
i.
P/N: Component
Part Number
j.
Fault Analysis
Performed:
Describe
the problem
and any special
procedures
used to isolate the
problem.
k.
Action Taken:
Check
the appropriate
maintenance
action
l.
Maint Level:
Enter the single element
maintenance
code IAW the MAC
m.
Work time:
Enter the required
time to complete
the task (hours and tenths)
n.
Work Description:
Describe
the procedures
used to perform the required
maintenance
o.
Old Component
Disposition:
What did you do with the old part (i.e., disposed,
turned
into general
support
for repair, etc.)
p.
Was system
integrity compromised?
Check
appropriate
box
q.
If yes, cleaning
procedure
used:
Enter the cleaning
procedure
used IAW Section
VII, Chapter
3.
r.
Was Air Sample
Taken?
Check
appropriate
box and enter the analysis
results
s.
Reentry
Control
Log Completed:
Enter initials after log entry is made
t.
Work Performed
By: Enter name,
rank, title of person
performing
maintenance
u.
Work Checked
By: Enter name,
rank, title of person
performing
check.
Instructions
for completing
the reentry control log areas
follows:
(figure 3-3)
a.
System:
Enter system
acronym
"SDASS"
b.
UIC: Unit Identification
Code
c.
Page
Nr: Enter sequential
log page number,
beginning
with 01
d.
REC Nr: Reentry
Control
Number;
a sequential
three digit number
assigned
to track entries
from
the REC Reports
beginning
with 001.
e.
Subassembly:
The portion of the system
being worked on (i.e., DASS, VTA, etc) transcribed
from
REC Report
f.
S/N:
Serial
Number
of the subassembly
g.
Component:
The part of the subassembly
that will be fixed (i.e., gage
isolation
valve, etc)
h.
P/N:
Part Number
of the component
i.
Julian Date:
Julian date
j.
Action Taken:
Enter replace,
repair,
etc., from REC Report
k.
Maint Level:
Enter maintenance
level from REC Report
l.
Work Time:
Enter time required
to complete
task from the AEC Report
m.
Remarks:
Enter pertinent
remarks,
cleaning
data, etc., in this block.
The reentry
control report will be completed
for all maintenance
actions
conducted
on the SDASS.
A record of the
maintenance
procedures
must be maintained
for the life of the system.
This requirement
is in addition to other
maintenance
documentation
required
through
TAMMS or unit requirements.
3-18