TM 5-4220-231-14&P(5)Insert gage through hole from front ofpanel.(6)Install and secure mounting bracket (2) togage (1) with two hex nuts (8). Positionwrench on each nut and turn clockwise.82(7)Lubricate new O-ring (7), M83248/2-113,with silicone compound (Item 9, AppendixD), and install on snubber (4). Wrap teflontape (Item 19, Appendix D) over threads ofsnubber, being careful not to cover O-ring.4(8)Position and tighten tube (6) to snubber(4). Position wrenches on union nut (5)and snubber (4), and turn union nutclockwise.765(9)Apply pressure to VTA. Leak-test withnonionic detergent solution (NID) GP (Item17, Appendix D).Correct leaks asnecessary.(10) Complete Reentry Control Report and Log.3-32
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business