TM 5-4220-225-14
Table 2-3. Daily Predive Procedures (Cont).
Step
Procedure
(4)
Inspect the drysuit neck piece for excessive wear and
deterioration.
(5)
Inspect the lower breech ring assembly for corrosion, damage,
and loose or missing screws.
c.
Neckdam Assembly.
(1)
Inspect the neckdam for excessive wear and deterioration.
(2)
Inspect the lower breech ring assembly for corrosion, damaged,
and loose or missing screws.
d.
Outer Garment.
(1)
Inspect the outer garment for tears, excessive wear, and loose
stitching.
(2)
Ensure Velcro is in good condition.
e.
Boots and Gloves.
(1)
Inspect the gloves and boots for tears, excessive wear, and
deterioration.
(2)
Ensure the boot straps and hardware are securely fastened and
in good operation condition.
2-12. Equipment Donning Procedures .
NOTE
The diving supervisor must ensure that PMCS and predive setup procedures have been
completed before equipment can be donned.
Table 2-4 provides the procedural steps that must be followed when donning the MK12 SSDS in bottom and air
neckdam configurations.
2-36
