TM 5-422G-231-14&P
(2)
Lubricate
new
O-ring
(5),
M83248/2-904,
with
silicone
compound
(Item 9, Appendix
D), and
install over threads on coupler (6).
(3)
Install coupler (6) in valve (4) by
4
turning clockwise.
5
6
(4)
Install valve stem through
opening
4
2
from back of panel.
Install hex nut
(3) on valve securing
valve to panel.
Ensure valve is in correct
position.
Install and secure
handle (1) to stem
by tightening
set screw (2) to valve
stem.
3
6
(5)
Lubricate
and install new O-ring (8),
M83248/2-010,
with
silicone
compound
(Item 9, Appendix
D).
Position and tighten coupler (6) to
tee
(9).
Turn union
nut
(7)
clockwise.
7,8
9
(6)
Apply pressure
tn CRS.
Leak-test
with nonionic
detergent
solution
(NID) GP (Item 17, Appendix
D).
Correct
leaks as necessary.
(7)
Complete
Reentry
Control
Report
and Log.
L'9
4/
2
4-107