TM 5-4220-231-14&P(2)Wrap teflon tape (Item 19, Appendix D)over threads of gage stem. Lubricate newO-ring (3), M83248/2-904, with siliconecompound (Item 9, Appendix D) and installon end of stem.(3)Install snubber (4) on gage stem.34(4)Position gage through hole from front ofpanel.(5)Install and secure mounting bracket (2) togage (1) with two hex nuts (8). Positionwrench on each nut and turn clockwise.828(6)Lubricate new O-ring (7), M83248/2-113,with silicone compound (Item 9, AppendixD) and install on snubber (4). Wrap teflontape (Item 19, Appendix D) over threads of4snubber, being careful not to cover O-ring.(7)Position and tighten tube (6) to snubber (4).Position wrenches on union nut andsnubber and turn union nut (5) clockwise.A65(8)Apply pressure to DAM Leak-test withnonionic detergent solution (NID) GP (Item17, Appendix D).Correct leaks asnecessary.(9)Reinstall and secure the DACC panel in theDACC case with all securing screws.Replace and secure case front cover overDACC panel.*8(10) Complete Reentry Control Report and log.3-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business